Search results for "Sludge management"
showing 3 items of 3 documents
An integral approach to sludge handling in a WWTP operated for EBPR aiming phosphorus recovery: simulation of alternatives, LCA and LCC analyses
2020
[EN] As phosphorus is a non-renewable resource mainly used to produce fertilizers and helps to provide food all over the world, the proper management of its reserves is a global concern since it is expected to become scarcer in the near future. In this work we assessed two different sludge line configurations aiming for P extraction and recovery before anaerobic digestion and compared them with the classical configuration. This study has been performed by simulation with the model BNRM2 integrated in the software package DESASS 7.1. Configuration 1 was based on the production of a PO4-enriched stream from sludge via elutriation in the primary thickeners, while Configuration 2 was based on t…
Dewatering of excess sludge produced by CAS and MBR aerobic treatment plants. effects of biochemical stability and EPS composition
2016
This paper investigates the behavior of different sludges from several treatment plants at full and pilot scale configured as Conventional Activated Sludge (CAS) and Membrane Bio Reactor (MBR) plants treating different kinds of wastewaters. The sludges collected were subjected to complete analytical and technological characterization in order to correlate the rheological properties that affect the dewatering behavior to the sludge chemical physical properties. In detail the EPS from the samples collected is extracted and characterized in terms of carbohydrates, proteins, uronic acids and humic acids content. Moreover, once characterized, the sludges were subjected to AD in order to assess t…
Enhanced Sewage Sludge Drying with a Modified Solar Greenhouse
2022
This work reports the results obtained with an innovative configuration of a closed-static solar greenhouse for sludge drying. The novelty of the solar greenhouse configuration consisted in using a forced ventilation system to provide hot air for sludge drying and the utilization of solar irradiation for energy supply. Wet sewage sludge (97% humidity) was successfully dried up to a residual humidity close to 5% after 25 days during wintertime. The increase of the airflow rate supplied under the sludge bed improved the sludge drying rate. Moreover, the fraction of volatile suspended solids decreased from 70% to 41% after 13 days, indicating that air supply promoted the simultaneous stabiliza…